Stories compiled from Petersburg City Council meeting notes and agendas. Report mistakes to nick@nickboylan.com.
Story20222023202420252026Last raised
Now
Digitizing the city charter and ordinancesOct 5 ’26
Aug 3 ’26City charter and ordinances to be digitized by a paid contractor
Aug 17 ’26Digitized city charter compiled and ready to be uploaded to the city website
Sep 8 ’26City ordinances digitized by a paid contractor; files ready for upload to the city website this week
Oct 5 ’26Planning Commission to review ordinances identified as potentially needing updates during the recent ordinance digitization
Wooded path at Fernstrom ParkOct 5 ’26
May 18 ’26Community service volunteers to clear a walking path at Fernstrom Park on May 23
Jun 1 ’26Community service group cleared the wooded pathway at Fernstrom Park and is to return in July
Jun 15 ’26Community Service team to return July 26 to mulch and possibly expand the new wooded path
Jul 20 ’26Purchase of poison ivy warning signs for the Fernstrom Park path being investigated
Jul 20 ’26Community service team to extend the Fernstrom Park wooded path about 200 feet on July 26
Aug 3 ’26County crew to re-mulch the Fernstrom Park wooded paths and treat poison ivy in October
Aug 17 ’26Four loads of wood chips dropped off at Fernstrom Park for the wooded path; the community service crew to return September 26
Oct 5 ’26Thirteen community service workers placed three dump loads of mulch along the Fernstrom Park wooded path; team to return in spring
Perry Park playground equipmentOct 5 ’26
Apr 6 ’26Replacement of play equipment at Perry Park under consideration; the mayor to look into safety and ADA requirements
Apr 20 ’26Perry Park play equipment raised by a councilmember; requirements, park guidelines and costs being researched
May 4 ’26Perry Park improvement assessment and proposal offered by a recreation products vendor, pending council approval
May 4 ’26Perry Park playground repairs approved: four baby swings replaced, swing set bolts rotated, wood chips refreshed, swing chains replaced as needed
May 18 ’26Toddler swing and one regular swing seat replacement at Perry Park deferred; proposal too high, better prices to be sought
Jun 15 ’26Purchase of a new slide for Perry Park approved
Jun 15 ’26Perry Park improvements including replacing wood and painting discussed for further action
Jul 6 ’26Repair and repainting of the large red swing at Perry Park requested
Jul 6 ’26New Perry Park slide expected by the end of August
Jul 20 ’26Red swing at Perry Park repaired and repainted
Jul 20 ’26New Perry Park slide reported available by late August
Sep 21 ’26New slide and three spring bouncers for Perry Park to be picked up Friday
Oct 5 ’26New slide and spring bouncers for Perry Park have arrived and will be installed by DPW when possible
Oct 5 ’26DPW painted the picnic table and added a no-skid painted texture to the balance beam
Monroe County Sheriff contract and deputy coverageOct 5 ’26
Dec 1 ’25Sheriff deputy position up for bid; a councilmember suggested the mayor write the sheriff seeking retention of the current deputy
Dec 15 ’25Retention of the city's sheriff deputy not possible under the bidding process; the deputy's last day set for January 10, 2026
Jul 20 ’26Council to review the city's contract with the Monroe County Sheriff's Department before the next meeting
Aug 3 ’26Police coverage and cost-effectiveness of the Monroe County Sheriff contract; the mayor to contact the sheriff
Aug 17 ’26County deputy to patrol the city primarily for the next 30 days, reviewed every 30 days; the sheriff said the city contract covers only the deputy's wages and benefits
Sep 8 ’26A new sheriff's deputy has been assigned to the city
Oct 5 ’26A councilmember suggested the deputy be asked to drive through Fernstrom Park regularly
Municipal parking lot and alley repavingOct 5 ’26
Nov 17 ’25DPW asked to fill the larger holes in the municipal parking lot
Mar 2 ’26Councilmember asked whether potholes in the alley behind Center Street can be filled
Jun 1 ’26Parking lot and alley paving awarded to Pro Finish
Jul 20 ’26DPW to add a storm drain behind the library to ease drainage, to be completed before the upcoming repaving
Aug 3 ’26Alleyway prepped and drainage improved; repaving pending
Sep 8 ’26Paving of the city parking lot and the alley expected to be completed by the end of the week, weather permitting
Sep 21 ’26Corrections to the alley paving to be addressed by Pro Finish, the mayor reported
Oct 5 ’26Drainage and water pooling behind the library reported after the alley paving; DPW to be asked to add gravel where water collects
Walnut tree removals in townOct 5 ’26
Oct 6 ’25Removal of a walnut tree in the right of way held over pending a second estimate
Oct 20 ’25Bid still pending for removal of a tree on Railroad
Dec 15 ’25Walnut tree removal on Railroad Street; the mayor to check on timing
Apr 20 ’26Logger contacted about the walnut trees; response awaited
May 18 ’26Removal of walnut trees in town; another party may be interested in taking the wood
Jun 1 ’26Removal of 14 walnut trees in town pending; insurance of the interested contractor to be verified
Aug 3 ’26Removal of several walnut trees in town and possible payment to the city for the wood under discussion
Aug 17 ’26Removal of several walnut trees stalled; tree services declined the job for lack of quantity
Sep 21 ’26Walnut tree removal on W. Railroad St. awarded to Cress Tree Service; city DPW to grind the stump
Oct 5 ’26W. Railroad St. will need a temporary closure for a large tree removal in the near future
Downtown sidewalk and concrete replacementOct 5 ’26
Mar 17 ’25Sidewalk on the south side of Center Street in disrepair; the mayor to check prices for concrete replacement
May 5 ’25Downtown sidewalk repairs quoted at $8,500; a second quote to be obtained
May 19 ’25City attorney to be asked who is responsible for the downtown sidewalks
Nov 3 ’25Second bid to be sought for concrete work on River Dale Drive
Jan 20 ’26Quotes being gathered to level the Center Street sidewalks
Feb 17 ’26Work on the new Welcome signs continuing
Mar 16 ’26Welcome sign quotes still being gathered
Apr 20 ’26New Welcome signs and their costs reported
May 4 ’26Four Welcome signs purchased from Unique Designs
May 18 ’26New city signs expected to be completed soon
Jun 1 ’26New city Welcome signs installed, with roses planted around them
Blight enforcement procedure and penaltiesMay 4 ’26
Apr 20 ’26Next step after a clean-up notice is delivered and the resident does not comply to be determined
May 4 ’26Blight letters in preparation; the clerk to ask the city attorney about fines in the blight ordinance
Angle parking on Center StreetApr 20 ’26
Apr 6 ’26Angle parking sought on the south side of E. Center Street; the mayor to check with the city engineer and report back
Apr 20 ’26Angle parking on Center Street: MDOT says implementation is up to the municipality
City clerk vacancy and appointmentApr 20 ’26
Mar 2 ’26City clerk position to be posted immediately, resumes due March 23; Council agreed to pay for one month of training the replacement
Mar 2 ’26City clerk's letter of retirement accepted, with a last day of May 29
Mar 16 ’26Resumes for the clerk's position accepted through March 23, with interviews by the mayor, clerk and treasurer to follow
Apr 6 ’26City Clerk seat filled effective June 1, 2026 at a $26,000 salary, $22 an hour during training beginning April 7, with MERS from June 1
Apr 20 ’26Resolution regarding clerk appointment and Board of Review approved
Apr 20 ’26Retiring clerk's phone to be paid by the city for two months after retirement
Building code enforcement ordinance and inspectorsApr 6 ’26
Mar 2 ’26City plumbing and mechanical inspector engaged, receiving 80% of permit fees with the City retaining 20%
Mar 2 ’26State permit fee schedules adopted for plumbing and mechanical permits
Mar 16 ’26First reading of Ordinance 26-0001, Enforcement of the Building Code, approved
Mar 16 ’26March 2 inspector motion amended: Mechanical Inspector and Plumbing Inspector positions filled separately upon State approval, and State Fee Schedules adopted
Apr 6 ’26Ordinance 26-0001, Enforcement of the Building Code, adopted on second reading
Downtown banners and bracketsMar 16 ’26
Jan 20 ’26Quotes being gathered for downtown banners
Feb 17 ’26Purchase of four banners and brackets approved
Mar 16 ’26Banners and brackets received for the four main corners
Street drainage studyMar 16 ’26
Feb 18 ’25Consultants permitted to begin a study to acquire additional funding available for street improvements, mainly drainage
Oct 6 ’25Drainage study reviewed; the city engineer suggests the DPW can do most of the work
Mar 16 ’26Progress on the results of the street drainage study requested
Regular storm sewer cleaning scheduleMar 16 ’26
Apr 1 ’24DPW to check whether storm sewers are being cleared of debris regularly
Mar 16 ’26Regular schedule for cleaning storm sewer entrances and uncovering storm drain lids requested
Fernstrom Park development, grants and clean-up daysMar 16 ’26
Feb 5 ’24River Raisin Watershed Council to present on Fernstrom Park development March 4 and hold an invasive plant cleanup March 23, 12-2pm
Mar 18 ’24Update on the restoration of Fernstrom Park presented to council
Apr 1 ’24Fernstrom Park clean-up day drew 33 volunteers and cleared much debris
Apr 15 ’24Fernstrom Park has received $550 in donations and a $600 Monroe Conservation District grant; planting day April 27
Jun 3 ’24Three donated picnic tables at Fernstrom Park; DPW to pour concrete pads, and mosquito spraying for the park requested
Jul 15 ’24New Fernstrom Park sign shown to council; three concrete picnic tables installed in the park
Aug 5 ’24Fernstrom Park received a $600 Monroe Conservation District grant and a $5,000 private donation
Sep 3 ’24Fernstrom Park Phase 2 temporarily stalled pending permits; a weeknight community clean-up and donated products and services under consideration
Sep 16 ’24Fernstrom Park permits still pending; park fall clean-up day scheduled for the evening of October 16
Nov 18 ’24Fernstrom Park management director authorized
Apr 7 ’25Fernstrom Park update: two bike racks ordered, top flower bed edged awaiting plants, coffee truck at park clean-up day April 26, 9am-12pm
Jun 2 ’25Fernstrom Park donor sign to be framed in wood and mounted near the top of the ramp by the bench, with DPW to do the work
Jun 2 ’25Concrete pad for another Fernstrom Park picnic table delayed; the company to be asked to hold the table
Nov 3 ’25City to receive $825 from a grant in process for Fernstrom Park
Mar 16 ’26Fernstrom Park sign to be installed at Wood and Railroad
Kayak and canoe launch at Fernstrom ParkFeb 2 ’26
Jul 17 ’23A more level kayak launch spot at Fernstrom Park requested; the mayor to look at it
Aug 5 ’24Boat launch options at Fernstrom Park under review with the DNR
Feb 18 ’25Permit application to EGLE for a potential boat launch to be submitted; fleximat cost lower than expected
Mar 17 ’25Kayak launch permit reported reviewed, with a further response awaited
Jul 21 ’25Fernstrom Park boat launch materials to be ordered
Aug 4 ’25Kayak/canoe launch material to be ordered now that the new backhoe is in service
Aug 18 ’25A 20-foot mat ordered for the canoe and kayak launch, to be installed by the DPW
Sep 2 ’25Kayak and canoe launch at Fernstrom Park reported complete
Feb 2 ’26Canoe and kayak signage to be installed soon
2025
Rezoning inquiry for two downtown buildingsDec 15 ’25
Nov 17 ’25Rezoning inquiry received for two commercial buildings; the Planning Commission to address it November 25
Dec 1 ’25One rezoning inquiry from a prospective buyer reviewed by the Planning Commission; no action taken
Dec 15 ’25One rezoning request pending; a councilmember has written to the applicant with what the Planning Commission wants before it considers it
City attorney legal services contractDec 15 ’25
Nov 17 ’25Legal services proposal from Mohr Budds Law accepted, commencing January 1, 2026
Dec 15 ’25City attorney retainer agreement with Mohr Budds Law, PLLC approved commencing January 1, 2026, with minor corrections
Vactor truck repairsDec 1 ’25
Mar 20 ’23Vactor truck tank patched after a partial collapse; a replacement expected
Oct 16 ’23Vactor truck leaking antifreeze and awaiting repair
Aug 18 ’25Old backhoe and pickup listed for two weeks on the Bidcorp online auction
Sep 2 ’25Bidcorp auction of the old backhoe and GMC pickup completed; more surplus items to be listed
Scrap metal cleanup behind the DPW barnAug 18 ’25
May 5 ’25Roll off box requested to collect scrap metal along the drive into Fernstrom Park
May 19 ’25A recycler contacted about bringing a dumpster to collect scrap metal behind the DPW garage; delivery of a 30 yard container to be arranged
Jun 2 ’25A recycler to deliver a dumpster for scrap metal when available
Aug 4 ’25Scrap metal dumpster to be secured once sludge hauling is complete, to clean up behind the DPW barn
Aug 18 ’25Scrap metal rolloff full and awaiting pickup
Tree trimming and removal listAug 4 ’25
Jul 21 ’25List of trees to trim or remove compiled for Council
Aug 4 ’25Tree trimming and removal list reviewed; DPW trimming underway and bids to be sought for 2-3 larger trees
Municipal parking lot sealing and stripingJul 7 ’25
Jun 16 ’25Parking lot sealing: one estimate in hand, at least one more to be sought
Jul 7 ’25Sealing and striping of both municipal parking lots awarded to K & B Asphalt Sealcoating for $4,444.90
Recreation Commission city representativesMay 5 ’25
Jul 5 ’22City and township representatives sought for the Recreation Commission
Dec 5 ’22Appointment to the Recreation Commission representing the City approved for a 3-year term beginning September 21, 2022
Jun 5 ’23One open seat representing the city on the Recreation Commission remains to be filled
Aug 19 ’24Two City representative seats on the Recreation Commission remain to be filled
Jan 21 ’25Three City representative seats on the Recreation Commission filled, with terms ending 7/1/25, 7/1/26 and 7/1/27
May 5 ’25One new city representative needed on the Recreation Commission beginning July 1
New roof for the DPW and police garageApr 21 ’25
Feb 18 ’25DPW and police garage reported to need a new roof this spring
Apr 21 ’25Roofing bid for the DPW and police garage awarded
Standby generator for the municipal buildingApr 21 ’25
Jan 16 ’24Standby generator for the municipal building; the mayor to obtain at least two quotes for council to consider
Feb 20 ’24Standby generator for the municipal building; the mayor to follow up on the contractor quote
Mar 4 ’24Standby generator for the municipal building: two proposals reviewed, a third to be obtained and the matter revisited
Mar 18 ’24Standby generator for the municipal building; a third proposal still awaited
Apr 15 ’24Third estimate for a standby generator for the municipal building not yet received
Oct 7 ’24$6,000 grant for operating secure elections received, to be used by May 31, 2025; council weighing use toward a standby generator for the municipal building, third bid sought
Mar 3 ’25$6,000 Institute for Responsive Government grant must be used by May 31, 2025; the clerk to secure updated quotes for a standby generator
Mar 17 ’2522kw standby generator for the municipal building purchased from Superior Industrial Supply and Service for $13,524, with a $6,000 Institute for Responsive Government grant applied
Apr 7 ’25Standby generator installation to begin next week, aimed for completion before the May 6 election
Apr 21 ’25Standby generator for the municipal building installed and awaiting inspections
State-required water system plans and studiesMar 17 ’25
Sep 16 ’24State requires several city plans and studies updated by March 2025, with training and a letter to the State by year end
Feb 18 ’25Water System Reliability Study and Asset Management Plan approved for submittal to the State for acceptance
Mar 17 ’25Water Deficit Reduction Plan Resolution approved as printed and presented
Solar powered speed and stop signsJan 21 ’25
Jun 6 ’22Solar speed signs requested for inclusion in the 2022-2023 budget
Jan 21 ’25Prices sought for flashing solar powered stop and speed signs
Angle parking at the elementary schoolJan 6 ’25
Oct 7 ’24Angle parking on the north side of the elementary school raised as a way to add parking spaces
Jan 6 ’25Whether the elementary school is still considering angle parking on Elm Street asked, since it would need to be known before street striping
City street improvement projectJan 6 ’25
Aug 21 ’23Street improvement options to be presented by the city engineer at the next meeting
Sep 5 ’23Street improvement plan to be presented by the city engineer at the next council meeting once costs are complete
Sep 18 ’23Road project discussion postponed to the next meeting pending further information
Oct 16 ’23Consultant report on street conditions, repairs, costs and financing presented; Council to choose streets to repair and put work out to bid
Oct 24 ’23Workshop held on plans for street improvements
Nov 1 ’23Street improvement project to proceed: TAMP submitted, up to 5 years of 50% advanced Act 51 funding sought from MDOT, project put out for bid
Feb 20 ’24Street improvement project bids going out this week
Mar 4 ’24Storm sewer work underway on two Center Street locations; the Rose Road site to require large rock to shore up the street edge and river bank
Mar 18 ’24Center Street storm sewer repair reported to be about two weeks from completion, pending the contractor
Apr 1 ’24Cold milling and resurfacing of city streets awarded to Gerken Paving, Inc. for $259,564.30
Apr 1 ’24Overband crack fill awarded to K & B Asphalt Sealcoating, Inc. for $16,516.80
Apr 15 ’24Trenching, gravel and HMA of city streets awarded to Gerken Paving, Inc. for $220,887.50
May 6 ’24Micro-surfacing and chip seal of city streets awarded to Henry W. Bergman, Inc. for $437,393.75
May 6 ’24Payment of $325,585.17 to Gerken Paving approved for street work completed
May 6 ’24Next two phases of street work to begin end of May, final phase in June and July
Jun 3 ’24Construction meeting with Gerken Paving set for June 5 to plan the next phase of street improvements, trenching
Jun 17 ’24Downtown section of the Center Street improvements reported not to be complete until the last week of July
Jul 15 ’24Final phases of the street project reviewed with engineers; a meeting with the contractor to be arranged
Aug 19 ’24Contractor materials for the final phase of the street project approved by the city engineers
Sep 3 ’24Road project restart delayed to later in the week by the contractors
Sep 16 ’24Final coat of micro seal on the road project to be applied the week of the 23rd, taking three to four days
Oct 7 ’24Street project reported under budget so far, with an ADA ramp on Chestnut Street and the raising of manholes still to be completed
Nov 4 ’24Paving contractor to raise 28 manholes in coming weeks and DPW to raise about 15 more with 1-inch rings
Nov 18 ’24Manhole lifting completed by Gerken Paving; DPW to address the remaining manholes as time permits
Dec 2 ’24City engineer to confirm the street project funds spent to date and what remains for a possible equipment purchase
Jan 6 ’25Street project funds spent to date to be confirmed to determine what remains for a possible equipment purchase
2024
Sewer rate increase and fee ordinanceNov 18 ’24
Oct 7 ’24Sewer rate increase suggested by the mayor to meet rising operating costs and possible replacement of aging equipment
Oct 21 ’24Quarterly sewer rate raised to $110 effective January 1, 2025, the first increase since 1997
Oct 21 ’24Whether the sewer rate may be set by resolution rather than ordinance; the clerk to consult the city attorney
Nov 4 ’24First reading approved of Ordinance #24-0002, amending Ordinance #96 to revise sewer system fees and charges
Nov 18 ’24Ordinance #24-0002 adopted on second reading, amending Ordinance #96 to revise sewer system fees and charges
Tree Lighting Ceremony arrangementsNov 18 ’24
Sep 16 ’24Tree Lighting Ceremony set for December 1, with the parking lot and Center Street between Saline and Wood closed for the event
Oct 21 ’24Whether city liability insurance covers horse drawn carriage rides at the Tree Lighting; the clerk to check
Nov 18 ’24Event committee request to block off the municipal parking lot the morning of December 1 for tree lighting
DTE LED streetlight conversionNov 18 ’24
Dec 18 ’23DTE phasing out high pressure sodium streetlights for LED fixtures; the mayor to seek more information from a DTE representative
Mar 4 ’24Cost estimate for converting city streetlights to LED presented; no action taken
Mar 18 ’24DTE proposal to convert streetlights to LED to be raised with DTE and addressed at the next meeting
Apr 1 ’24DTE streetlight conversion to LED to proceed
Apr 15 ’24DTE contract for LED streetlight conversion pending; cost to light the paved path to Summerfield High School to follow
May 6 ’24DTE invoice for the LED streetlight conversion expected soon
Nov 4 ’24DTE credit of $4,476.31 issued for newly converted LED streetlights for July-September
Nov 4 ’24Summerfield Schools to be asked about paying the monthly electric cost for two of the new path lights on school property
Nov 18 ’24Summerfield School willing to pay monthly electric cost for two path lights on school property; mayor to obtain a DTE rate to bill the school
Tree trimming and removal contract with All-Year Tree ServiceNov 4 ’24
Sep 18 ’23Removal of five trees awarded to Cress Tree Service for $6,845
Portable generator repairsSep 5 ’23
Jun 20 ’23Portable generator reported to be under repair
Jul 3 ’23Repair work on the portable generator continues
Aug 1 ’23Portable generator to go out for additional repair
Aug 21 ’23Generator motor repaired; error code still to be corrected
Sep 5 ’23Portable generator repaired and back in use, with minor adjustment still needed
DTE tree grant plantings and removalsSep 5 ’23
May 2 ’222022 DTE Tree Grant application to be prepared
Sep 6 ’22DTE Tree Grant awards delayed; tree planting may not happen this fall
Oct 17 ’22$800 DTE tree grant awarded to the City; 10 trees to be planted in early November
Nov 1 ’22Three of four estimates received for tree removals; a minimum of ten trees to be planted this fall with grant money
Nov 21 ’22Ten trees to be planted by a nursery next week
Dec 5 ’22Whether new trees will be planted this year reported uncertain
Sep 5 ’23Nursery offers to plant the four trees not planted last fall
DPW employee vacancy and hiring searchJun 20 ’23
May 15 ’23Search for a DPW employee continues with no applicants yet
Jun 5 ’23Open DPW position: one interview held, a second set for Thursday
Jun 20 ’23Open DPW position filled, with the new employee starting June 26
2023 city water rate increaseJun 5 ’23
May 15 ’23Water rates rise 10% per 1,000 gallons for city and township residents and bulk water rate set at $17.50 per 1,000 gallons, effective July 1, 2023; resolution to follow
Jun 5 ’23Resolution adopting rates and charges for the City Water System approved
Removal of old nonworking hydrantsMay 1 ’23
Jun 20 ’22Bags ordered to cover old nonworking hydrants until they can be removed
May 1 ’23Only 5-6 old hydrants remain to be removed
Tree removal and trimming bid awardApr 17 ’23
Apr 3 ’23Two estimates being sought for removal of three trees and trimming of one
Apr 17 ’23Tree removal and trimming bid awarded to All-Year Tree Service, $5,300 for removal of three trees and trimming of one
Document shredding day at spring clean-upApr 17 ’23
Feb 6 ’23Document shredding day to be explored for the April 29 Spring Clean-up date
Feb 21 ’23Shredding company still being sought to attend cleanup day
Mar 6 ’23City shredding event with Summerfield Township to be explored, with costs and possible sponsors pursued
Mar 20 ’23Document shredding offered to city and Summerfield Township residents by Lenawee County Goodwill at $.25 per pound on April 29 if the date is secured
Apr 3 ’23Document shredding confirmed for April 29, 9am-1pm in the municipal parking lot with Summerfield Township, alongside Spring Clean Up
Apr 17 ’23DPW asked to barricade the municipal parking lot Saturday morning before shred day for the truck to set up
Landscaping restoration for the water projectApr 17 ’23
Dec 19 ’22Landscaping to finish water project restoration to go out for 3-5 bids, work to be completed in the spring
Feb 21 ’23Five lawn care companies to bid on the restoration project; bids due March 10 at 11:30 a.m
Mar 20 ’23Davey Tree Expert Company bid of $24,477.25 accepted for landscaping restoration to complete the water system upgrade project
Mar 20 ’23Contract with Davey Tree Expert Company for landscaping restoration approved as drafted by consultants and reviewed by the city attorney
Apr 17 ’23Restoration work from the water project has begun and should be complete this week
Police coverage and the school liaison officerFeb 21 ’23
Jan 18 ’22Police coverage revisited with the county sheriff and Summerfield Schools; superintendent to attend February 7 and the sheriff February 22
Feb 7 ’22School liaison officer position proposed to stay as is for now, with possible periodic city patrols; school grants for liaison officers may open in March or April
Feb 7 ’22School superintendent and the sheriff to return to the February 22 council meeting to discuss liaison officer options
Feb 22 ’22County sheriff gave council an update on the school liaison officer and city police coverage
Jun 6 ’22Police coverage for the city under discussion with the Sheriff's Department
Sep 6 ’22Sheriff deputy to check in at both Summerfield schools morning, lunch and end of day, and attend Friday night games when scheduled
Feb 6 ’23Effect of the school district's safety resource officer grant on the city's current sheriff contract to be determined
Feb 21 ’23Mayor met with the sheriff on the school resource officer and its effect on the city
2022
Winter 2022 tree removals by All-Year Tree ServiceDec 5 ’22
Nov 21 ’22Six trees to be removed by All Year Tree Service on the low bid of $7,800
Dec 5 ’22Seven trees to be removed by All Year Tree Service December 26-28
Finalizing the water main project with the excavating contractorDec 5 ’22
Jan 18 ’22Half of a repair bill to be paid for damages possibly caused by the water project contractor
Feb 22 ’22Attorney's letter to E.R. Zeiler Excavating on finalizing the water project to be signed by the mayor and sent by the clerk
Mar 16 ’22City engineer and city attorney gave updates on the USDA Water Project regarding E.R. Zeiler Excavating's proposed March 5, 2022 contract additions
Mar 16 ’22Mayor directed to sign and send a letter to E.R. Zeiler Excavating responding to the proposed March 5, 2022 contract additions to the USDA Water Project
Apr 18 ’22Contractor to perform restoration work for the water project on April 25
May 16 ’22Water project reviewed by the mayor with the city engineer and attorney on May 11
Jun 6 ’22Finalizing the water main project and mediation with the contractor discussed, with the matter still pending
Jun 20 ’22Water project status and final payment letter to the contractor still unanswered
Jul 5 ’22Water project finalization still without an update
Aug 22 ’22Excavating contract to be terminated seven days after notice over six unfinished change orders; city to finish work and charge the contractor
Sep 6 ’22Water project wrap-up pending; cost to complete punch list items being priced with DAC, then referred to the city attorney and USDA
Dec 5 ’22Resolution authorizing the final payment request and closing the Waterline Replacement Project adopted
City office hoursSep 19 ’22
Aug 8 ’22Revision of Friday city office hours tabled to the August 22, 2022 meeting
Aug 22 ’22Office hours proposal held until the September 6, 2022 meeting when the clerk will be present